Battery Capacity Calculator

Estimate required amp-hours and watt-hours from target runtime, load, voltage, efficiency, and discharge assumptions.

Capacity Planning Inputs

W
hours
V
This calculator estimates the minimum practical battery size for planning. Conservative margins help account for aging, temperature, and real field variation.

Required Capacity

Load Energy
0.00 Wh
Raw energy requirement from watts × runtime.
Required Battery Energy
0.00 Wh
Adjusted for usable discharge, efficiency, and reserve margin.
Required Capacity
0.00 Ah
Estimated battery capacity needed at the selected system voltage.
Suggested Nominal Target
0.00 Wh
Nominal battery energy target including entered reserve margin.

Frequently Asked Questions

What is the basic battery sizing formula?

A practical first estimate starts with load watts multiplied by required runtime to get watt-hours, then adjusts that energy for inverter efficiency and usable depth of discharge before converting to amp-hours at the selected system voltage.

Why does a higher system voltage reduce required amp-hours?

For the same watt-hour requirement, a higher voltage battery bank needs fewer amp-hours because watt-hours are the product of volts and amp-hours.

What This Calculator Is For

When planning a battery-backed system, users often know the load and the runtime they want — but not the battery size required to achieve it. This calculator reverses the runtime question and estimates how much battery capacity is needed.

Typical practical questions include:

This calculator is designed for those early planning and sizing checks.

What It Calculates

The tool estimates:

It is useful for UPS planning, control panels, mobile systems, telecom backup, and general DC battery sizing discussions.

Core Relationships

These are planning formulas and do not replace manufacturer discharge curves or detailed battery engineering.

Practical Use Cases

This kind of calculator is useful for:

Important Limitations

This tool is intended for first-pass planning, not final design validation. Real required capacity can be affected by:

For critical systems, always confirm sizing with vendor data, project requirements, and field-specific engineering review.

FAQ

Why does required battery capacity go up when depth of discharge is limited?

If only part of the nominal battery energy is considered usable, the total installed battery capacity must be larger to deliver the same required load energy.

Why is system voltage important?

For the same watt-hour requirement, a higher system voltage means fewer amp-hours are needed. That changes battery-bank configuration and current levels.

Should I add extra margin on top of this result?

Usually yes. Many real systems need margin for aging, temperature, surge loads, or future expansion.